Audio Booth (AHEC-1) / 音频控制台组(AHEC-1)
🎤 Audio CrewBooth Team / 音响组
音频控制台组
Crew Overseer / 小组监督: Gyeong-hwan Lee 李俊辉
| Team / 小组 | Members / 成员 |
|---|---|
| Audio Booth / 音频控制台组 | • Willy 🔑 |
🇬🇧 English Instructions
Purpose
Install, connect, and commission the Audio Headend (AHEC-1) according to the schematics before testing and operation.
⚠️ Safety & Installation Notes
• Strict NO FOOD or DRINK policy inat the booth.Audio Booth. (CO-160 2:5)
• Cell phones and tablets can introduce noise into the system; be mindful of this while operating equipment. (CO-160 2:5)
• Do not apply power until instructed by the Power Distribution Team.Team confirms that power is ready.
Required References
- Full Drawing Set: 📎 Complete PDF
- Congregation Job Hazard Analysis (DC-85): 📁 Google Drive Folder
- CO-160a: Chapter 3 — Audio Headend AHEC-1, pages 1–2, Commissioning an Audio Installation
Required Equipment Cases
- AHEC-1: Contains the Audio Headend, including the 16-channel mixer, 2x DSPs, 3x amplifiers, power conditioner, and accessories.
Setup Steps
1. Cable Management
2. Position the Audio Headend
Schematics: Pages 1-2 Audio Equipment Layout Plan, 4-2 AV Control Area Large Scale View
- Move AHEC-1 to the Audio Control Area.
- Position
the equipmentAHEC-1 according to thedeskcontrol-arealayoutlayout.
🗺️ View Associated Schematics (Pages 1-2, 4-2)


2.3. Connect Audio Equipment
Schematics: Pages 6-1 Audio Headend Wiring Diagram, 6-48 IntercomAudio SystemEquipment Wiring DiagramSchedule
- Connect
allthe audioequipmentmulticore cable (AMC-1), microphone inputs, loudspeaker outputs, and other audio connections to AHEC-1 according to the schematics. AttachCoordinateawithtagthe Video Booth Team for the AIF-1 and AIF-2 media audio connections from PC-1 and PC-2.
🗺️ View AssociatedAudio Headend Schematics (Pages 6-1, 6-4)8)



3.4. Connect to Power
Schematics: Pages 1-4 Power Distribution Layout Plan, 6-6 Power Distribution Wiring Diagram
- Connect
the Audio BoothAHEC-1 to the power socket provided by the Power Distribution Team. - Before applying power, make sure all mixer faders, including the MASTER fader, are fully down and all amplifiers are turned off.
🗺️ View Power Schematics (Pages 1-4, 6-6)


4.5. Commission the Audio System
Reference: CO-160a, Chapter 3 — Audio Headend AHEC-1, pages 1–2, Commissioning an Audio Installation
Schematics: Pages 6-1 Audio Headend Wiring Diagram, 6-2 Loudspeaker Wiring Diagram, 6-3 Audio Loudspeaker Wiring Diagram
- Commission
theAHEC-1audioaccordingsystem as outlined into the CO-160aguidelines.Commissioning an Audio Installation procedure.
🗺️ View Audio Commissioning Schematics (Pages 6-1, 6-2, 6-3)



Completion Checklist
- Cables routed neatly and tagged
Dismantling Procedure
- Wait for the department briefing and prayer 30 minutes after the program ends on Sunday before dismantling.
- Power down AHEC-1 according to the
audioCO-160aheadendshutdown procedure: - Mute all DSP inputs and
disconnectoutputs.
- AHEC-1
- AIF-1 and AIF-2 returned to AHEC-1
🇨🇳 中文说明
目的
根据图纸安装、连接并调试音频主控设备 (AHEC-1),为测试和正式运行做好准备。
⚠️ 安全与安装提示
• 控制台内严禁饮食。音频控制台严禁饮食。 (CO-160 2:5)
• 手机和平板电脑也会让系统出现杂音,手机和平板电脑会让系统出现杂音,操作设备时请留意。 (CO-160 2:5)
• 未经配电组确认,在电源分配组确认电源准备好之前,不要接通电源。
参考资料
- 完整图纸: 📎 完整 PDF 文件
- 《会众工作危险性分析》(DC-85): 📁 Google Drive 文件夹
- CO-160a: 第 3 章 — Audio Headend AHEC-1,第 1–2 页,Commissioning an Audio Installation
所需设备箱
- AHEC-1: 包含音频主控设备、16 通道混音器、2 台数字信号处理器 (DSP)、3
台功放及附件。台功放、电源调节器及附件。
安装步骤
1. 线缆管理
2. 放置音频主控设备
图纸:1-2 音频设备布局图、4-2 音视频控制区大比例图
- 将 AHEC-1 移动到音频控制区。
按照控制台布局图摆放设备。按照控制区布局图摆放 AHEC-1。
🗺️ 查看相关图纸(图纸 1-2, 4-2)


2.3. 连接音频设备
图纸:6-1 音频主控接线图、6-48 对讲系统接线图音频设备清单
根据图纸连接所有音频设备。按照图纸,将音频多芯线缆 (AMC-1)、麦克风输入、扬声器输出及其他音频连接接到 AHEC-1。为每根线缆贴上标签,标明其用途。与视频控制台组协调 PC-1 和 PC-2 的 AIF-1、AIF-2 媒体音频连接。
🗺️ 查看相关图纸(查看音频主控相关图纸(图纸 6-1, 6-4)8)



3.4. 连接电源
图纸:1-4 电源分配布局图、6-6 电源分配接线图
将音频控制台连接到配电组提供的电源插座。将 AHEC-1 连接到电源分配组提供的电源插座。未经配电组确认电源已准备好之前,不要开启系统。接通电源前,确认所有混音器推子(包括 MASTER 推子)都已完全降下,并且所有功放都已关闭。
🗺️ 查看电源相关图纸(图纸 1-4, 6-6)


4.5. 调试音频系统
参考资料:CO-160a,第 3 章 — Audio Headend AHEC-1,第 1–2 页,Commissioning an Audio Installation
图纸:6-1 音频主控接线图、6-2 扬声器接线图、6-3 讲台及部门扬声器接线图
参照按照 CO-160a指南调试音频系统。的 Commissioning an Audio Installation 程序调试 AHEC-1。在移交进行走位练习前,核实功放设置、DSP使用配置,并测试输入/输出信号。VENU360 连接 DSP;如果 LBD 已提供大会专用预设,请调用该预设。
🗺️ 查看音频调试相关图纸(图纸 6-1, 6-2, 6-3)



完成检查表
- 线缆已整齐布设并贴上标签
拆卸步骤
- 在星期日节目结束 30 分钟后,等待整个部门的简短会议和祷告后再开始拆除工作。
-
关闭音频主控设备电源,并断开所有信号线和电源线。按照 CO-160a 的程序关闭 AHEC-1: - 将所有 DSP 输入和输出静音。
- AHEC-1
- AIF-1 和 AIF-2 已归还 AHEC-1