Power Distribution Setup / 电源分配安装
⚡ Power Team / 电源组
Coordinator / 协调人: JP Bourgeois 柏松
| Team / 小组 | Members / 成员 |
|---|---|
| Power Distribution / 电源分配 | • Han 韩丞华 🔑 |
🇬🇧 English Instructions
Purpose
Distribute power to all A/V equipment and the stage, ensuring safe cable routing and connections according to the schematics.
⚠️ Safety & Installation Notes
• USE QUALIFIED ELECTRICIAN to connect PDU to venue distribution board (3-phase supply) in corridor behind stage.
• Do not overload electrical circuits.
• Ensure that pedestrians are protected from trip hazards and electric shock. Use cable covers or suspend wiring overhead.
Required References
- Full Drawing Set: 📎 Complete PDF
- Event Content List: Cases PCS-1, PCS-3, UPS-01
Required Equipment Cases
- PCS-1: Contains cables, sockets, 1x 1-phase PDU, and tools.
- PCS-3: Contains main power equipment, 1x 3-phase PDU (PDU-01), and cables.
- UPS-01: Contains rack-mounted UPS for AV desk backup power.
Setup Steps
1. Main Power Connection
Schematics: Pages 1-4 Power Distribution Layout Plan, 6-6 Power Distribution Wiring Diagram, 6-10 PDU Circuit Breaker Schedule
- A qualified electrician must connect PDU-01 to the venue distribution board.
- Set up the PDU circuit breakers according to the schedule.
🗺️ View Associated Schematics (Pages 1-4, 6-6, 6-10)



2. Pull Power Cables to AV Booth
Schematics: Pages 1-4 Power Distribution Layout Plan, 6-7 Power Distribution Video Control Desk Wiring Diagram
- Pull power cables from the A/V booth to a wall socket.
- Install the UPS (UPS-01) for the video control desk.
🗺️ View Associated Schematics (Pages 1-4, 6-7)


3. Pull Power Cables to Stage
Schematics: Pages 1-4 Power Distribution Layout Plan, 6-6 Power Distribution Wiring Diagram
- Pull power cables from behind the stage up onto the stage for the clock.
🗺️ View Associated Schematics (Pages 1-4, 6-6)


4. Assist with Cabling Protection
- When done, help the Audio Cabling Team to cover cabling with carpet and floor channels.
Completion Checklist
- Main PDU connected by qualified electrician
- Circuit breakers set according to schedule
- Power cables pulled to A/V booth and stage clock
- Audio Cabling Team assisted with cable protection
- Keyman inspection completed
Dismantling Procedure
- Wait for the department briefing and prayer 30 minutes after the program ends on Sunday before dismantling.
- Ensure all AV equipment is powered down before disconnecting power distribution equipment.
- Gather all power cables, PDU, and UPS and bring to the designated area.
- Note for team leader: Use the Bill of Materials (BOM) to cross off every box or case before it is brought to the truck:
- PCS-1
- PCS-3
- UPS-01
🇨🇳 中文说明
目的
根据图纸为所有音视频设备和讲台分配电源,确保安全的走线和连接。
⚠️ 安全与安装提示
• 必须由合格的电工将配电单元 (PDU) 连接到讲台后方走廊的场地配电盘(三相电源)。
• 不要让电路过载。
• 确保行人免受绊倒和触电的危险。使用线缆盖板或将电线悬挂在高处。
参考资料
- 完整图纸: 📎 完整 PDF 文件
- 大会设备清单: 设备箱 PCS-1, PCS-3, UPS-01
所需设备箱
- PCS-1: 包含线缆、插座、1 个单相 PDU 和工具。
- PCS-3: 包含主电源设备、1 个三相 PDU (PDU-01) 和线缆。
- UPS-01: 包含机架式不间断电源 (UPS),用于音视频控制台的备用电源。
安装步骤
1. 主电源连接
图纸:1-4 电源分配布局图、6-6 电源分配接线图、6-10 PDU 断路器清单
- 必须由合格的电工将 PDU-01 连接到场地配电盘。
- 根据清单设置 PDU 断路器。
🗺️ 查看相关图纸(图纸 1-4, 6-6, 6-10)



2. 铺设音视频控制台电源线
图纸:1-4 电源分配布局图、6-7 视频控制台电源接线图
- 将电源线从音视频控制台拉到墙上的插座。
- 安装用于视频控制台的不间断电源 (UPS-01)。
🗺️ 查看相关图纸(图纸 1-4, 6-7)


3. 铺设讲台电源线
图纸:1-4 电源分配布局图、6-6 电源分配接线图
- 将电源线从讲台后方拉到讲台上,供时钟使用。
🗺️ 查看相关图纸(图纸 1-4, 6-6)


4. 协助线缆保护
- 自己的工作完成后,协助音频布线组使用地毯和地面线槽覆盖并保护线缆。
完成检查表
- 合格的电工已连接主 PDU
- 断路器已按清单设置
- 电源线已拉至音视频控制台和讲台时钟
- 已协助音频布线组进行线缆保护
- 负责人已检查确认
拆卸步骤
- 在星期日节目结束 30 分钟后,等待整个部门的简短会议和祷告后再开始拆除工作。
- 在断开配电设备之前,确保所有音视频设备已关闭电源。
- 收集所有电源线、PDU 和 UPS,并带到指定区域。
- 组长注意: 在将每个箱子或设备箱搬上卡车前,请使用物料清单 (BOM) 核对并划掉每一项:
- PCS-1
- PCS-3
- UPS-01