Skip to main content

Power Distribution Setup / 电源分配安装

⚡ Power Distribution Team / 电源组

Coordinator / 协调人: JP Bourgeois 柏松

电源分配组
Team / 小组 Members / 成员
Power Distribution / 电源分配 • Han 韩丞华 🔑

🇬🇧 English Instructions

Purpose
DistributeThis section provides the specific setup and dismantling instructions for the Power Distribution Team during the 2026 Bangkok Regional Convention. This team is responsible for routing power to all A/V equipment and thesupporting stage,installation ensuring safe cable routing and connections according toof the schematics.

intercom

communication ⚠️ Safety & Installation Notes
• USE QUALIFIED ELECTRICIAN to connect PDU to venue distribution board (3-phase supply) in corridor behind stage.
• Do not overload electrical circuits.
• Ensure that pedestrians are protected from trip hazards and electric shock. Use cable covers or suspend wiring overhead. system.

Required References

  • Full Drawing Set: 📎 Complete PDF
  • Specific Schematics:
    • 1-4 Power Distribution Layout Plan
    6-4 Intercom System Wiring Diagram 6-6 Power Distribution Wiring Diagram 6-7 Power Distribution Video Control Desk Wiring Diagram 6-9 Video and Power Equipment Schedule 6-10 PDU Circuit Breaker Schedule Event Content List: Cases PCS-1, PCS-3, UPS-01IC-1/1, IC-1/2

    Required Equipment Cases

    • PCS-1: Contains power distribution cables, sockets, 1x 1-phase PDU, and tools.
    • PCS-3: Contains main power equipment, 1x 3-phase PDU (PDU-01), and cables.
    • UPS-01:IC-1/1: Contains rack-mountedthe UPSEzicom Intercom Master Station (IMS-1).
    IC-1/2: Contains the Ezicom beltpacks and headsets.

    💡 Priority / Operating Notes:
    • Electrician Required: Use a qualified electrician to connect the main 3-phase PDU (PDU-01) to the venue distribution board in the corridor behind the stage.
    • Intercom Layout: Please make sure the team understands that the main intercom unit (IMS-1) is located at the Video Booth. There are two headsets for AVthe deskstage backup(left power.and right) and one headset for the Audio Booth.
    • Do not overload electrical circuits.
    • Use rubber cable protectors when crossing walkways and carpet covers under seating areas.

    Setup Steps

    1. MainPull Power ConnectionCables to the A/V Booths
    Schematics: Pages 1-4 Power Distribution Layout Plan, 6-6 Power Distribution Wiring Diagram, 6-7 Power Distribution Video Control Desk Wiring Diagram

      Pull power cables from the A/V control booths to the wall socket or main power supply. Route power to the Video Booth, Audio Booth, and any required control-area equipment. Do not connect or power on equipment until the Power Distribution Team confirms that power is ready.
      🗺️ View Associated Schematics (Pages 1-4, 6-6, 6-7)
      1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

      6-6 Power Distribution Wiring Diagram showing PDU-01, power sockets, audio headend power, TVs, and LED wall power distribution / 电源分配接线图,显示 PDU-01、电源插座、音频主控供电、电视及 LED 屏幕电源分配

      6-7 Power Distribution Video Control Desk Wiring Diagram showing UPS-01, VHEC-1, wireless receivers, intercom master unit, and video control desk power connections / 视频控制台电源接线图,显示 UPS-01、VHEC-1、无线接收器、对讲主机及视频控制台电源连接

      2. Pull Power Cables to the Stage
      Schematics: Pages 1-4 Power Distribution Layout Plan, 6-6 Power Distribution Wiring Diagram, 6-9 Video and Power Equipment Schedule, 6-10 PDU Circuit Breaker Schedule

        Pull power cables from behind the stage up onto the stage to supply power for stage A/V equipment and LED walls. A qualified electrician must connect PDU-01 to the venue distribution board. Set up the PDU circuit breakers according to the schedule. Confirm that the required power points are available before the Audio, Video, and LED teams begin final commissioning.
        🗺️ View Associated Schematics (Pages 1-4, 6-6, 6-9, 6-10)
        1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

        6-6 Power Distribution Wiring Diagram showing PDU-01, power sockets, audio headend power, TVs, and LED wall power distribution / 电源分配接线图,显示 PDU-01、电源插座、音频主控供电、电视及 LED 屏幕电源分配

        6-9 Video and Power Equipment Schedule listing video equipment, TVs, LED walls, PDU, UPS, cables, and power distribution equipment / 视频和电源设备清单,列出视频设备、电视、LED 屏幕、PDU、UPS、线缆及电源分配设备

        6-10 PDU Circuit Breaker Schedule listing breaker loads for back row TVs, main video control desk, stage AV equipment, audio system, and LED walls / PDU 断路器清单,列出后排电视、主视频控制台、舞台影音设备、音频系统及 LED 屏幕的断路器负载

        2.3. PullInstall PowerIntercom Cables to AV BoothSystem
        Schematics: PagesPage 1-6-4 PowerIntercom Distribution Layout Plan, 6-7 Power Distribution Video Control DeskSystem Wiring Diagram

        • Pull power cables from the A/V booth to a wall socket.
        Install the UPSintercom (UPS-01)system for the videoVideo, controlAudio, desk.and Stage crews. Place the main master station (IMS-1) at the Video Booth. Route the connections for the 2 stage headsets and 1 audio headset according to the schematic. Confirm communication between the Video Booth, Audio Booth, and Stage positions.
        🗺️ View AssociatedIntercom SchematicsSystem Schematic (Pages 1-4,Page 6-7)4)
        1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

        6-7 Power Distribution Video Control Desk Wiring Diagram showing UPS-01, VHEC-1, wireless receivers, intercom master unit, and video control desk power connections / 视频控制台电源接线图,显示 UPS-01、VHEC-1、无线接收器、对讲主机及视频控制台电源连接

        3. Pull Power Cables to Stage
        Schematics: Pages 1-4 Power Distribution Layout Plan, 6-6 Power Distribution Wiring Diagram

          Pull power cables from behind the stage up onto the stage for the clock.
          🗺️ View Associated Schematics (Pages 1-4, 6-6)
          1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

          6-6 Power Distribution Wiring Diagram showing PDU-01, power sockets, audio headend power, TVs, and LED wall power distribution / 电源分配接线图,显示 PDU-01、电源插座、音频主控供电、电视及 LED 屏幕电源分配6-4 Intercom System Wiring Diagram showing IMS-1 master unit, intercom belt packs, headsets, and cable connections / 对讲系统接线图,显示 IMS-1 主机、对讲腰包、耳机及线缆连接

          4. AssistCable with Cabling ProtectionManagement

          • Use rubber cable protectors when crossing walkways.
          Use carpet covers for cables running under seating areas. Consider attaching a tag to each cable identifying its use if time permits. Note: When done,putting helpcarpet covers down over walkways, tape one side only. Tape the Audioother Cablingside Teamonce tothe coverentire cablinginstallation withis carpet and floor channels.finished.

          Completion Checklist

          • Main 3-phase PDU connected by qualified electrician
          • Circuit breakers set according to schedule
          • Power cables pulled to A/V booth and stage clockbooths
          • Power cables pulled to stage A/V equipment and LED walls
           Intercom master station placed at Video Booth  Stage and Audio CablingBooth Teamintercom assistedheadsets connected  Walkway cables protected with rubber cable protectionprotectors  Seating-area cables protected with carpet covers Keyman inspection completed

          Dismantling Procedure

          • Wait for the department briefing and prayer 30 minutes after the program ends on Sunday before dismantling.
          • EnsureCarefully power down all AVequipment.
          equipment isDisconnect powered down before disconnectingall power distributionand equipment.intercom cables.  Remove cable protectors and carpet covers carefully.  Coil and label all cables. Gather all power cables, PDU, and UPSequipment and bring it to the designated area. Note for team leader: Use the Bill of Materials (BOM) to cross off every box or case before it is brought to the truck:
          • PCS-1
          • PCS-3
          • UPS-01IC-1/1
           IC-1/2

          🇨🇳 中文说明

          目的
          根据图纸为所有音视频设备和讲台分配电源,确保安全的走线和连接。

          本页面提供

          2026 年曼谷区域大会期间 ⚠️电源分配组 安全与安装提示
          • 必须由合格的电工将配电单元 (PDU) 连接到讲台后方走廊的场地配电盘(三相电源)。
          • 不要让电路过载。
          • 确保行人免受绊倒和触电的危险。使用线缆盖板或将电线悬挂在高处。 的具体安装和拆卸说明。该小组负责为所有音视频设备布设电源,并协助安装对讲通信系统。

          参考资料

          6-4 对讲系统接线图 6-6 电源分配接线图 6-7 视频控制台电源接线图 6-9 视频和电源设备清单 6-10 PDU 断路器清单 大会设备清单: 设备箱 PCS-1, PCS-3, UPS-01IC-1/1, IC-1/2

          所需设备箱

          • PCS-1: 包含线缆、包含电源分配线缆、插座、1 个单相单相 PDU 和工具。
          • PCS-3: 包含主电源设备、1 个三相三相 PDU (PDU-01) 和线缆。
          • UPS-01:IC-1/1: 包含机架式不间断电源包含 Ezicom 对讲系统主机 (UPS),用于音视频控制台的备用电源。IMS-1)。
          IC-1/2: 包含 Ezicom 对讲系统腰包和耳机。

          💡 优先事项 / 操作提示:
          • 需要电工: 请安排合格的电工将主三相 PDU (PDU-01) 连接到讲台后方走廊的场馆配电箱(三相电源)。
          • 对讲系统布局: 请确保团队明白,对讲系统的主机 (IMS-1) 放置在视频控制台。分配给讲台有 2 个耳机(左侧和右侧),音频控制台有 1 个耳机。
          • 不要让电路过载。
          • 穿过过道时使用橡胶电缆盖板,座位区域下方使用地毯盖板。

          安装步骤

          1. 主电源连接布置音视频控制台电源
          图纸:1-4 电源分配布局图、6-6 电源分配接线图、6-107 PDU 断路器清单视频控制台电源接线图

          • 必须由合格的电工将 PDU-01 连接到场地配电盘。将电源线从音视频控制台布置连接到墙壁插座或主电源。
          • 根据清单设置为视频控制台、音频控制台及所需控制区设备布设电源。
          PDU 断路器。在配电组确认电源准备好之前,不要连接或开启设备。
          🗺️ 查看相关图纸(图纸 1-4, 6-6, 6-10)7)
          1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

          6-6 Power Distribution Wiring Diagram showing PDU-01, power sockets, audio headend power, TVs, and LED wall power distribution / 电源分配接线图,显示 PDU-01、电源插座、音频主控供电、电视及 LED 屏幕电源分配

          6-10 PDU Circuit Breaker Schedule listing breaker loads for back row TVs, main video control desk, stage AV equipment, audio system, and LED walls / PDU 断路器清单,列出后排电视、主视频控制台、舞台影音设备、音频系统及 LED 屏幕的断路器负载6-7 Power Distribution Video Control Desk Wiring Diagram showing UPS-01, VHEC-1, wireless receivers, intercom master unit, and video control desk power connections / 视频控制台电源接线图,显示 UPS-01、VHEC-1、无线接收器、对讲主机及视频控制台电源连接

          2. 铺设音视频控制台电源线布置讲台电源
          图纸:1-4 电源分配布局图、6-76 视频控制台电源接线图电源分配接线图、6-9 视频和电源设备清单、6-10 PDU 断路器清单

          • 将电源线从音视频控制台拉到墙上的插座。将电源线从讲台后方的走廊拉到讲台上,为讲台音视频设备和 LED 屏幕供电。
          • 安装用于视频控制台的不间断电源必须由合格的电工将 (UPS-01)。PDU-01 连接到场地配电盘。
          根据清单设置 PDU 断路器。 在音频组、视频组和 LED 组进行最后调试前,确认所需电源点已准备好。
          🗺️ 查看相关图纸(图纸 1-4, 6-7)
          1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

          6-7 Power Distribution Video Control Desk Wiring Diagram showing UPS-01, VHEC-1, wireless receivers, intercom master unit, and video control desk power connections / 视频控制台电源接线图,显示 UPS-01、VHEC-1、无线接收器、对讲主机及视频控制台电源连接

          3. 铺设讲台电源线
          图纸:1-4 电源分配布局图、6-6 电源分配接线图

            将电源线从讲台后方拉到讲台上,供时钟使用。
            🗺️ 查看相关图纸(图纸 1-4,6, 6-6)9, 6-10)
            1-4 Power Distribution Layout Plan showing PDU, UPS, and power distribution locations / 电源分配布局图,显示 PDU、UPS 及电源分配位置

            6-6 Power Distribution Wiring Diagram showing PDU-01, power sockets, audio headend power, TVs, and LED wall power distribution / 电源分配接线图,显示 PDU-01、电源插座、音频主控供电、电视及 LED 屏幕电源分配

            6-9 Video and Power Equipment Schedule listing video equipment, TVs, LED walls, PDU, UPS, cables, and power distribution equipment / 视频和电源设备清单,列出视频设备、电视、LED 屏幕、PDU、UPS、线缆及电源分配设备

            6-10 PDU Circuit Breaker Schedule listing breaker loads for back row TVs, main video control desk, stage AV equipment, audio system, and LED walls / PDU 断路器清单,列出后排电视、主视频控制台、舞台影音设备、音频系统及 LED 屏幕的断路器负载

            3. 安装对讲系统
            图纸:6-4 对讲系统接线图

              为视频组、音频组和讲台组安装对讲系统。 将对讲系统主机 (IMS-1) 放置在视频控制台。 根据图纸连接通往讲台的 2 个耳机和音频控制台的 1 个耳机。 确认视频控制台、音频控制台和讲台位置之间通讯正常。
              🗺️ 查看对讲系统图纸(图纸 6-4)
              6-4 Intercom System Wiring Diagram showing IMS-1 master unit, intercom belt packs, headsets, and cable connections / 对讲系统接线图,显示 IMS-1 主机、对讲腰包、耳机及线缆连接

              4. 协助线缆保护线缆管理

              • 自己的工作完成后,协助音频布线组使用地毯和地面线槽覆盖并保护线缆。在穿过过道时使用橡胶电缆盖板。
              座位区域下方的线缆使用地毯盖板。 如果时间允许,请考虑为每根线缆贴上标签以标明其用途。 注意: 在过道铺设地毯盖板时,只需先用胶带固定一侧。等整个安装完成后再用胶带固定另一侧。

              完成检查表

              • 合格的电工已连接主合格电工已连接主三相 PDU
              • 断路器已按清单设置
              • 电源线已拉至音视频控制台和讲台时钟电源线已拉至音视频控制台
              • 已协助音频布线组进行线缆保护电源线已拉至讲台音视频设备和 LED 屏幕
               对讲主机已放置在视频控制台  讲台和音频控制台对讲耳机已连接  过道线缆已使用橡胶电缆盖板保护  座位区域线缆已使用地毯盖板保护 负责人已检查确认

              拆卸步骤

              • 在星期日节目结束 30 分钟后,等待整个部门的简短会议和祷告后再开始拆除工作。
              • 在断开配电设备之前,确保所有音视频设备已关闭电源。小心关闭所有设备电源。
              • 收集所有电源线、PDU拆除所有电源线和对讲系统线缆。
              和 UPS,并带到指定区域。小心移除电缆盖板和地毯盖板。  整理并标识所有线缆。  收集所有设备并带到指定区域。 组长注意: 在将每个箱子或设备箱搬上卡车前,请使用物料清单 (BOM) 核对并划掉每一项:
              • PCS-1
              • PCS-3
              • UPS-01IC-1/1
               IC-1/2