Skip to main content

Video Cabling & TVs Setup / 视频布线及电视安装

🎬 Video Cabling Team / 视频布线组

Team / 小组 Members / 成员
Video Cabling / 视频布线 • Keiichi 加藤圭一 🔑
• Jaturaphat (Dern)
•

🇬🇧 English Instructions

Purpose
Pull and cover all SDI video cables, set up the HDMI splitters, and position the TV monitors according to the schematics before system commissioning.

⚠️ Safety & Installation Notes
• Keep walkways clear.
• Protect all cables crossing walkways.
• Installation Note: When putting carpet covers down, tape one side only. Tape the other side once installation is finished.

Required References

  • Full Drawing Set: 📎 Complete PDF
  • Event Content List: Cases VSC-01, VSC-02, CPS-1, CPS-3, VDS-1, VDS-2, VDS-3

Required Equipment Cases

  • VSC-01 & VSC-02: Contains SDI video cables (25m and 50m lengths).
  • CPS-1: Contains 10x 3-channel plastic flap floor cable protectors and 10x rubber mats.
  • CPS-3: Contains carpet strips for covering cables.
  • VDS-1: Contains 3x 43" Samsung TVs and table stands.
  • VDS-2: Contains 1x 24" Confidence Monitor and SDI distributors.
  • VDS-3: Contains 65" TVs with wheel cases and lifts.

Setup Steps

1. Pull SDI Cables
Schematics: Pages 1-3 Video Equipment Layout Plan, 1-5 Cable Pathway Plan

  • Pull SDI cables according to the schematics. Follow the audio snake cable when going through the front middle seat section.
🗺️ View Associated Schematics (Pages 1-3, 1-5)
1-3 Video Equipment Layout Plan showing video headend, LED walls, and display monitor locations / 视频设备布局图,显示视频主控、LED 屏幕及显示器位置

1-5 Cable Pathway Plan showing cable routes, control areas, and walkway cable protection points / 电缆路径图,显示线缆路线、控制区域及走道线缆保护位置

2. Protect Cabling
Schematics: Page 1-5 Cable Pathway Plan

  • Cover cabling with tape and carpet. Use rubber covers when crossing walkways, and carpet covers for cables under chairs.
🗺️ View Cable Pathway Plan (Page 1-5)
1-5 Cable Pathway Plan showing cable routes, control areas, and walkway cable protection points / 电缆路径图,显示线缆路线、控制区域及走道线缆保护位置

3. Stow HDMI Splitter
Schematics: Pages 4-1 Stage Area Equipment Layout, 6-5 Video Display Wiring Diagram

  • Stow the HDMI splitter away under the stage and tape down the cables firmly on the floor.
🗺️ View Stage and Video Display Schematics (Pages 4-1, 6-5)
4-1 Stage Area Equipment Layout Large Scale View showing microphones, speakers, monitors, LED walls, and power distribution around the stage / 舞台区域设备布局大比例图,显示麦克风、扬声器、显示器、LED 屏幕及舞台电源分配

6-5 Video Display Wiring Diagram showing VHEC-1 video headend, laptops, TVs, LED walls, and signal routing / 视频显示系统接线图,显示 VHEC-1 视频主控、电脑、电视、LED 屏幕及信号路线

4. Install TVs and Monitors
Schematics: Pages 1-3 Video Equipment Layout Plan, 6-5 Video Display Wiring Diagram

  • Position the TV monitors (VDS-1, VDS-2, VDS-3) in the seating area, stage, and department areas according to the Video Equipment Layout Plan.
🗺️ View TV and Monitor Schematics (Pages 1-3, 6-5)
1-3 Video Equipment Layout Plan showing video headend, LED walls, and display monitor locations / 视频设备布局图,显示视频主控、LED 屏幕及显示器位置

6-5 Video Display Wiring Diagram showing VHEC-1 video headend, laptops, TVs, LED walls, and signal routing / 视频显示系统接线图,显示 VHEC-1 视频主控、电脑、电视、LED 屏幕及信号路线

Completion Checklist

  • SDI cables pulled and routed correctly
  • Cabling follows audio snake in the middle section
  • Cables protected (rubber covers in walkways, carpet under chairs)
  • HDMI splitter stowed safely under stage
  • TV monitors positioned
  • Keyman inspection completed

Dismantling Procedure

  • Wait for the department briefing and prayer 30 minutes after the program ends on Sunday before dismantling.
  • Gather all video cabling, splitters, and TVs and bring them to the designated area.
  • Gather all rugs used to hold down cabling too.
  • Confirm no cables remain in the seating area.
  • Note for team leader: Use the Bill of Materials (BOM) to cross off every box or case before it is brought to the truck:
    • VSC-01 & VSC-02
    • CPS-1 & CPS-3
    • VDS-1, VDS-2, VDS-3

🇨🇳 中文说明

目的
根据图纸铺设并覆盖所有 SDI 视频线缆,设置 HDMI 分配器,并安装电视监视器,为系统调试做好准备。

⚠️ 安全与安装提示
• 保持通道畅通。
• 所有经过通道的线缆都必须加以保护。
• 安装提示: 铺设地毯压线盖时,先只用胶带固定一侧。等整体安装完成后再固定另一侧。

参考资料

  • 完整图纸: 📎 完整 PDF 文件
  • 大会设备清单: 设备箱 VSC-01, VSC-02, CPS-1, CPS-3, VDS-1, VDS-2, VDS-3

所需设备箱

  • VSC-01 & VSC-02: 包含 SDI 视频线缆(25 米和 50 米长度)。
  • CPS-1: 包含 10 个 3 槽塑料地面线缆保护盖板和 10 个橡胶垫。
  • CPS-3: 包含用于保护线缆的地毯压线条。
  • VDS-1: 包含 3 台 43 寸三星电视及桌面支架。
  • VDS-2: 包含 1 台 24 寸讲台提示屏幕 (Confidence Monitor) 及 SDI 分配器。
  • VDS-3: 包含 65 寸电视及带升降功能的设备轮箱。

安装步骤

1. 铺设 SDI 线缆
图纸:1-3 视频设备布局图、1-5 电缆路径图

  • 根据图纸铺设 SDI 视频线缆。在穿过前排中间座位区时,请沿着主音频蛇线 (snake cable) 铺设。
🗺️ 查看相关图纸(图纸 1-3, 1-5)
1-3 Video Equipment Layout Plan showing video headend, LED walls, and display monitor locations / 视频设备布局图,显示视频主控、LED 屏幕及显示器位置

1-5 Cable Pathway Plan showing cable routes, control areas, and walkway cable protection points / 电缆路径图,显示线缆路线、控制区域及走道线缆保护位置

2. 保护线缆
图纸:1-5 电缆路径图

  • 使用胶带和地毯覆盖并保护线缆。线缆穿越通道时必须使用橡胶过线槽进行保护,椅子下方使用地毯压线盖。
🗺️ 查看电缆路径图(图纸 1-5)
1-5 Cable Pathway Plan showing cable routes, control areas, and walkway cable protection points / 电缆路径图,显示线缆路线、控制区域及走道线缆保护位置

3. 放置 HDMI 分配器
图纸:4-1 舞台区域设备布局图、6-5 视频显示系统接线图

  • 将 HDMI 分配器妥善放置在讲台下方,并用胶带将线缆牢牢固定在地板上。
🗺️ 查看舞台及视频显示图纸(图纸 4-1, 6-5)
4-1 Stage Area Equipment Layout Large Scale View showing microphones, speakers, monitors, LED walls, and power distribution around the stage / 舞台区域设备布局大比例图,显示麦克风、扬声器、显示器、LED 屏幕及舞台电源分配

6-5 Video Display Wiring Diagram showing VHEC-1 video headend, laptops, TVs, LED walls, and signal routing / 视频显示系统接线图,显示 VHEC-1 视频主控、电脑、电视、LED 屏幕及信号路线

4. 安装电视监视器
图纸:1-3 视频设备布局图、6-5 视频显示系统接线图

  • 按照视频设备布局图,将电视监视器(VDS-1、VDS-2、VDS-3)摆放到观众区、讲台及各部门位置。
🗺️ 查看电视及监视器图纸(图纸 1-3, 6-5)
1-3 Video Equipment Layout Plan showing video headend, LED walls, and display monitor locations / 视频设备布局图,显示视频主控、LED 屏幕及显示器位置

6-5 Video Display Wiring Diagram showing VHEC-1 video headend, laptops, TVs, LED walls, and signal routing / 视频显示系统接线图,显示 VHEC-1 视频主控、电脑、电视、LED 屏幕及信号路线

完成检查表

  • SDI 线缆已铺设并正确走线
  • 中间区域的线缆已沿着音频蛇线铺设
  • 线缆已保护(通道使用橡胶盖板,椅子下使用地毯)
  • HDMI 分配器已安全放置在讲台下
  • 电视监视器已摆放到位
  • 负责人已检查确认

拆卸步骤

  • 在星期日节目结束 30 分钟后,等待整个部门的简短会议和祷告后再开始拆除工作。
  • 收集所有视频线缆、分配器和电视,并带到指定集合区域。
  • 收集所有用于固定线缆的地毯。
  • 确认座位区域没有遗留线缆。
  • 组长注意: 在将每个箱子或设备箱搬上卡车前,请使用物料清单 (BOM) 核对并划掉每一项:
    • VSC-01 & VSC-02
    • CPS-1 & CPS-3
    • VDS-1, VDS-2, VDS-3