Video Cabling & TVs Setup / 视频布线及电视安装
🎬 Video Cabling & TVs Team / 视频布线及电视组
| Team / 小组 | Members / 成员 |
|---|---|
| Video Cabling & TVs / 视频布线及电视 | • Keiichi 加藤圭一 🔑 • Jaturaphat (Dern) • |
🇬🇧 English Instructions
Purpose
This section provides the specific setup and dismantling instructions for the Video Cabling & TVs Team. This team is responsible for setting up displays around the venue and routing SDI video cables to them.
Required References
- Full Drawing Set: 📎 Complete PDF
- Specific Schematics:
- 1-3 Video Equipment Layout Plan
- 1-5 Cable Pathway Plan
- Event Content List: Cases VDS-1, VDS-2, VDS-3, VSC-01, VSC-02, CPS-1, CPS-3
Required Equipment Cases
- VDS-1, VDS-2, VDS-3: Contains TVs, confidence monitors, and their stands.
- VSC-01 & VSC-02: Contains SDI video cables, including 25m and 50m lengths.
- CPS-1 & CPS-3: Contains rubber cable protectors, rubber mats, and carpet strips.
Setup Steps
1. Install TVs and Monitors First
Schematics: Page 1-3 Video Equipment Layout Plan
- Install all TVs and monitors around the venue first so the team can confirm the exact locations where SDI cables need to be pulled.
- Confirm each TV location before running cables.
- Note: TV-3 is located in the Accounting Department.
🗺️ View Video Equipment Layout Schematic (Page 1-3)

2. Pull SDI Cables
Schematics: Pages 1-3 Video Equipment Layout Plan, 1-5 Cable Pathway Plan
- Pull and route SDI cables to the confirmed TV locations according to the schematics.
- When going through the front middle seating section, follow the audio snake cable route.
- Keep SDI cables neat and avoid crossing walkways unless necessary.
🗺️ View Associated Schematics (Pages 1-3, 1-5)


3. Install Cable Protection
Schematics: Page 1-5 Cable Pathway Plan
- Use rubber cable protectors when crossing walkways.
- Use carpet covers for cables running under seating areas.
- Coordinate with the Audio Cabling Team so cable protection is installed neatly for both audio and video cable routes.
🗺️ View Cable Pathway Schematic (Page 1-5)

4. Secure Cabling
- Cover the cabling with tape and carpet once both the audio and video cabling are completely finished.
- Note: When putting carpet covers down over walkways, tape one side only. Tape the other side once the entire installation is finished.
- Consider attaching a tag to each SDI cable identifying its destination if time permits.
Completion Checklist
- TVs and monitors installed
- TV-3 placed in the Accounting Department
- SDI cables pulled to confirmed TV locations
- SDI route follows audio snake cable through front middle seating section
- Walkway cables protected with rubber cable protectors
- Seating-area cables protected with carpet covers
- Cabling secured after both audio and video cabling are completed
- Keyman inspection completed
Dismantling Procedure
- Wait for the department briefing and prayer 30 minutes after the program ends on Sunday before dismantling.
- Carefully disconnect all SDI and power cables from the TVs.
- Remove cable protection and carpet covers carefully.
- Coil and label SDI cables.
- Gather all equipment, TVs, cables, and rugs used to hold down cabling, and bring them to the designated area.
- Note for team leader: Use the Bill of Materials (BOM) to cross off every box or case before it is brought to the truck:
- VDS-1
- VDS-2
- VDS-3
- VSC-01
- VSC-02
- CPS-1
- CPS-3
🇨🇳 中文说明
目的
本页面提供 视频布线及电视安装组 的具体安装和拆卸说明。该小组负责在场馆各处安装显示屏幕,并将 SDI 视频线布置连接到这些屏幕。
参考资料
- 完整图纸: 📎 完整 PDF 文件
- 相关图纸:
- 1-3 视频设备布局图
- 1-5 电缆路径图
- 大会设备清单: 设备箱 VDS-1, VDS-2, VDS-3, VSC-01, VSC-02, CPS-1, CPS-3
所需设备箱
- VDS-1, VDS-2, VDS-3: 包含各种电视、讲台提示屏幕及其支架。
- VSC-01 & VSC-02: 包含 SDI 视频线,包括 25 米和 50 米长度。
- CPS-1 & CPS-3: 包含橡胶电缆盖板、橡胶垫和地毯盖板。
安装步骤
1. 首先安装电视和屏幕
图纸:1-3 视频设备布局图
- 首先在场馆各处安装所有电视和屏幕,这样团队就能确认 SDI 视频线需要拉到的确切位置。
- 拉线前确认每台电视的位置。
- 注意: TV-3 位于会计部。
🗺️ 查看视频设备布局图(图纸 1-3)

2. 布置 SDI 视频线
图纸:1-3 视频设备布局图、1-5 电缆路径图
- 根据图纸,将 SDI 视频线拉到已经确认好的电视位置。
- 在穿过前方中间的座位区时,请沿着主音频线的路线走线。
- 保持 SDI 视频线整齐,尽量避免穿过过道。
🗺️ 查看相关图纸(图纸 1-3, 1-5)


3. 安装线缆保护盖板
图纸:1-5 电缆路径图
- 在穿过过道时使用橡胶电缆盖板。
- 座位区域下方的线缆使用地毯盖板。
- 与音频布线组协调,确保音频和视频线缆路线都整齐地受到保护。
🗺️ 查看电缆路径图(图纸 1-5)

4. 固定线缆
- 等音频和视频的布线都完全结束后,用胶带和地毯把线缆盖好固定。
- 注意: 在过道铺设地毯盖板时,只需先用胶带固定一侧。等整个安装完成后再用胶带固定另一侧。
- 如果时间允许,请考虑为每根 SDI 视频线贴上标签,标明连接位置。
完成检查表
- 电视和屏幕已安装
- TV-3 已放置在会计部
- SDI 视频线已拉到确认好的电视位置
- 前方中间座位区的 SDI 线缆已沿主音频线路线走线
- 过道线缆已使用橡胶电缆盖板保护
- 座位区域线缆已使用地毯盖板保护
- 音频和视频布线完成后,线缆已固定
- 负责人已检查确认
拆卸步骤
- 在星期日节目结束 30 分钟后,等待整个部门的简短会议和祷告后再开始拆除工作。
- 小心地从电视上拔除所有 SDI 视频线和电源线。
- 小心移除电缆盖板和地毯盖板。
- 整理并标识 SDI 视频线。
- 收集所有设备、电视、线缆以及用来盖住线缆的地毯,把它们带到指定区域。
- 组长注意: 在将每个箱子或设备箱搬上卡车前,请使用物料清单 (BOM) 核对并划掉每一项:
- VDS-1
- VDS-2
- VDS-3
- VSC-01
- VSC-02
- CPS-1
- CPS-3