Power distribution
Power distribution
Purpose Thank you for keeping everything safely powered! Your team safely runs mains power from the venue outlets to the A/V booth, the stagestage, and the active speakers,loudspeakers. andAudio thenCabling helpshandles coveraudio cables.
AssignmentBefore scope
starting, Power runs mains power only. Audio Cabling runsreview the audioteam's cables. The lobbyDC-83 and Accountingsheets speakers4-1 useand wall6-2 sockets.in the schematics.
⚠️ Electrical safety•Only a qualified persondoesperforms electrical work thatneedsrequires a qualification. Never changeanyan equipment ground.
•SetInspectaside damaged cords,andavoidsetoverloadedaside any damaged cord. Don't overload circuits.• Never run power near the baptism area (area 11) or wet floors. If equipment must be used where it could get wet, protect it with an RCD (GFCI).• Cover every walkway crossing,circuits, andlet the teams know before switching on.• Roll the PCS-2 (power distribution set, 50 kg) case with a helper.
Required referencesFull drawing set:CABR-2026 schematic, final draft (PDF)Hazard analysis:DC-83 (job hazard analysis) draftsSheets for this team:4-1 (outlets and booth route), 6-2 (active speakerkeep powernote)Equipment list:October BOM— cases listed below
Equipment casesCaseContentsPCS-2 (power distribution set)Power cables and socketsCPS-1 (cable protection set)Covers and rubber mats (shared with Audio Cabling)CPS-3 (cable protection set)Carpet strips (shared with Audio Cabling)
Power scheduleSupplyFromToSheetA/V boothVenue outlet on the left of sheet 4-1 ("Powers AV-booth")Along the stage front, then down the centre line to the A/V booth4-1Stage equipmentVenue outlet on the right of sheet 4-1Equipment on and behind the stage, including the stage monitors (one supply for both)4-1, 6-2Lobby speakerNearest wall socketSPK-Lobby6-2Accounting speakerNearest wall socket,away from the baptism areaSPK-and wet floors.What your team does
Confirm the two venue outlets shown on sheet 4-1 and check the expected loads. From the left outlet, run the booth supply along the stage front and then down the centre route to the A/V booth. From the right outlet, supply the stage equipment, including the two stage monitors. Confirm safe wall sockets for the lobby and Accounting
6-2speakers. Keep the Accounting supply away from the baptism area. Cover every floor crossing. Tell the nearby teams before switching on, then hand the checked booth supply to the A/V Booth team. When the power work is finished, help Audio Cabling cover the remaining floor crossings.The venue wireless receivers at the stage may also need power;
pleaseconfirmcheckthis with the venue technician.
Setup steps
1. Confirm outlets and loadsSheet: 4-1Confirm both venue outlets and the equipment loads before running cables.Check the wall sockets beside the lobby and Accounting speakers.
2. Run the booth supplyFollow the route on sheet 4-1: from the left outlet along the stage front, then down the centre line to the booth.Cover every walkway crossing and tape the cable flat.
3. Run the stage supplyFrom the right outlet to the stage monitors and other stage equipment.
4. Lobby and AccountingSheet: 6-2Use the wall socket beside each unit, and run aThe PCS-2leadcaseonlyweighsifaboutneeded.50At Accounting, keep power away from the baptism areakg andwetshouldfloors.be
5. Inspect and hand overWalk every route and check the covers.Let the teams know before switching on, and confirm the booth supply before the booth powers up.a
6. Helprolled withcoversOnce power is done, please help Audio Cabling cover the floor crossings.
Completion checklistOutlets and loads confirmedBooth supply run as sheet 4-1 showsStage supply run; stage monitors poweredLobby and Accounting speakers poweredEvery crossing covered; exits clearTeams told before switching onFinal check by the keyman
DismantlingAt
Thank you for keeping us safe! After the program onhelper. Sunday(AprilteardownKorellassignmentsgoeswilltobetheaddedpackinglater.team):Pleaseteardown, wait for theegress and packingsafety meetingwithandprayer,make30sureminutespowerafter the program ends.Switchis off beforedisconnectinganythinganything.is disconnected.Coil the cords neatly and pack PCS-2.Bring everything to the packing area; the keyman does a final check.