Power distribution

Power distribution

Team Keyman 🔑 Crew PowerJeff Korell Jeff Korell Nico Martinez; April Korell

Purpose Thank you for keeping everything safely powered! Your team safely runs mains power from the venue outlets to the A/V booth, the stagestage, and the active speakers,loudspeakers. andAudio thenCabling helpshandles coveraudio cables.

AssignmentBefore scope
starting, Power runs mains power only. Audio Cabling runsreview the audioteam's cables. The lobbyDC-83 and Accountingsheets speakers4-1 useand wall6-2 sockets.in the schematics.

⚠️ Electrical safety
• Only a qualified person doesperforms electrical work that needsrequires a qualification. Never change anyan equipment ground.
•Set Inspectaside damaged cords, andavoid setoverloaded aside any damaged cord. Don't overload circuits.
• Never run power near the baptism area (area 11) or wet floors. If equipment must be used where it could get wet, protect it with an RCD (GFCI).
• Cover every walkway crossing,circuits, and let the teams know before switching on.
• Roll the PCS-2 (power distribution set, 50 kg) case with a helper.

Required references

    Full drawing set: CABR-2026 schematic, final draft (PDF) Hazard analysis: DC-83 (job hazard analysis) drafts Sheets for this team: 4-1 (outlets and booth route), 6-2 (active speakerkeep power note) Equipment list: October BOM — cases listed below

    Equipment cases

    Case Contents PCS-2 (power distribution set) Power cables and sockets CPS-1 (cable protection set) Covers and rubber mats (shared with Audio Cabling) CPS-3 (cable protection set) Carpet strips (shared with Audio Cabling)

    Power schedule

    Supply From To Sheet A/V booth Venue outlet on the left of sheet 4-1 ("Powers AV-booth") Along the stage front, then down the centre line to the A/V booth 4-1 Stage equipment Venue outlet on the right of sheet 4-1 Equipment on and behind the stage, including the stage monitors (one supply for both) 4-1, 6-2 Lobby speaker Nearest wall socket SPK-Lobby 6-2 Accounting speaker Nearest wall socket, away from the baptism area SPK-and wet floors.

    What your team does

      Confirm the two venue outlets shown on sheet 4-1 and check the expected loads. From the left outlet, run the booth supply along the stage front and then down the centre route to the A/V booth. From the right outlet, supply the stage equipment, including the two stage monitors. Confirm safe wall sockets for the lobby and Accounting 6-2speakers. Keep the Accounting supply away from the baptism area. Cover every floor crossing. Tell the nearby teams before switching on, then hand the checked booth supply to the A/V Booth team. When the power work is finished, help Audio Cabling cover the remaining floor crossings.

      The venue wireless receivers at the stage may also need power; pleaseconfirm checkthis with the venue technician.


      Setup steps

      1. Confirm outlets and loads Sheet: 4-1

        Confirm both venue outlets and the equipment loads before running cables. Check the wall sockets beside the lobby and Accounting speakers.
        🗺️ View Sheet 4-1

        Sheet 4-1 — Stage Area Large Scale View
        Sheet 4-1 Stage Area Large Scale View: stage microphones, stage monitors, AMC-3 stage box and power outlets

        2. Run the booth supply

          Follow the route on sheet 4-1: from the left outlet along the stage front, then down the centre line to the booth. Cover every walkway crossing and tape the cable flat.

          3. Run the stage supply

            From the right outlet to the stage monitors and other stage equipment.

            4. Lobby and Accounting Sheet: 6-2

              Use the wall socket beside each unit, and run aThe PCS-2 leadcase onlyweighs ifabout needed.50 At Accounting, keep power away from the baptism areakg and wetshould floors.be
              🗺️ View Sheet 6-2

              Sheet 6-2 — Loudspeakers Wiring Diagram
              Sheet 6-2 Loudspeakers Wiring Diagram: passive loudspeaker chains, speakON splitters and active speakers

              5. Inspect and hand over

                Walk every route and check the covers. Let the teams know before switching on, and confirm the booth supply before the booth powers up.

                6. Helprolled with covers

                a
                  Once power is done, please help Audio Cabling cover the floor crossings.

                  Completion checklist

                     Outlets and loads confirmed  Booth supply run as sheet 4-1 shows  Stage supply run; stage monitors powered  Lobby and Accounting speakers powered  Every crossing covered; exits clear  Teams told before switching on  Final check by the keyman

                    Dismantling

                    Thank you for keeping us safe! After the program onhelper. Sunday (Aprilteardown Korellassignments goeswill tobe theadded packinglater. team):

                    At
                       Pleaseteardown, wait for the egress and packing safety meeting withand prayer,make 30sure minutespower after the program ends.  Switchis off before disconnectinganything anything.is disconnected. Coil the cords neatly and pack PCS-2.  Bring everything to the packing area; the keyman does a final check.