Safety, dismantling and references
Safety, dismantling and references
Your safety matters more than any deadline. This page is a short reminder; theThe detailed guidance is in CO-160 (A/V guidelines) Chapter 6, A-149 (A/V setup safety)149, and youreach team's DC-83 (job hazard analysis) draftanalysis.
During
Beforedelivery and during installationsetup
FridayAttend 16:30the safety briefing (Trucking Department, tentative). Saturday 08:00 safety talk and prayeryour (JPkeyman's Bourgeois).DC-83 Keymenreview. then review the task hazards and PPE with their crews.
Please know whereKnow the nearest
exits are,exit and keep
all exits and walkways clear.
AskUse enough helpers for
helpers with any loadanything over 20 kg or
anybulky. bulkyRoll case,wheeled cases. Wear work shoes and
rollgloves; wheeleduse cases (weights are on the equipment page). Gloves and work shoes, please. Hardhard hats
are required for
raised raised-speaker work.
Close
thecase latches before moving
a case, and keep equipment in its case until installation.
Only qualified volunteers do electrical work that needs a qualification.equipment. Inspect
cordscables and cover
crossings.every floor crossing.
TripodsKeep aretripods level, locked and sandbagged. Connect
cablesa speaker before raising
a speaker,it and keep others clear.
IfReport aan speakerincident, hangsnear overmiss, adamaged walkway, keep at least 2.1 m clear underneathitem or
putunsafe upcondition aimmediately. barrier.Stop Usework barriersif orsomething signsis when needed.unsafe.
PleaseKeep report any incident or near miss to your overseer straight away.
If something looks unsafe, please stopfood and
telldrinks youraway keyman.from SafetyA/V always comes before the 12:00 target.equipment.
Sunday dismantling
The teardown teams and keymen are not final. They will be added after the live roster is updated. Until then, do not use the setup teams or any earlier teardown list as an assignment.
We noteNote the actual program end. 30 minutes later: egress and packing safety meeting with prayer, led by A/V (leader to be confirmed). Let the audience leaveleave. first.The teardown safety meeting and prayer begins 30 minutes after the actual end; wait for it before starting.
EachThe setupmeeting teamleader dismantleswill itsname ownthe teams, keymen, packing area withand itswork keyman.order. Packing team members go straight to the packing area. If a keyman is on the packing team, his overseer names a stand-in.
Switch off power before
disconnecting.disconnecting anything.
Lower
raised speakers with
enoughtwo helperspeople and hard hats. Remove stands,
microphonesmicrophones, cables and
cable covers without
leavingcreating trip hazards.
TheReturn A/V Booth team returns theall venue
wireless microphonesequipment to venue staff.
Bring
everythingevery item to the packing area. The packing team
receives it, checks it against the
October BOM. andPut boxes it. Eacheach item
goes back in
theits boxcorrect itbox; came in; cables carry acable colour
tagtags matchingmatch theirthe box.
Every part is accounted for before a case goes to Trucking.
IfReport anything is damaged, pleaseand photograph
itdamage. and report it to LBD: LBD office 02-821-6620, [email protected] (broadcasting contact: William Neessen). LatchClose every
case,latch, and strap wheeled cases in the truck rather than relying on
lockingthe wheels.wheel locks.
Packing team (live roster)
Name
Keyman
Jason Kirby
Crew
Zabrina Bourgeois; Karina Li; April Korell
Stage dismantling stand-in (named by Jeff)
Packing area location
Return truck time and loading crew
Reference links
Schematics and equipment overview — sheets, venue layout, cases and key points.
Thank you all for your loving support and hardcareful work!work.