Advanced Search
Search Results
26 total results found
Convention and Assembly A/V
Setup instructions 搭建说明
This chapter contains the setup instructions for the 2026 Bangkok Regional Convention Audio/Video Department. 本章节包含 2026 年曼谷区域大会影音部的安装说明。 PRIORITY / 优先事项 Please prioritize installing the audio multicore cable (also known as a snake cable), AMC-1, and the l...
Audio Cabling Setup / 音频线缆安装
🎤 Audio Cabling Team / 音频布线组 Team Information / 小组信息 Item / 项目 Information / 信息 Team / 小组 Audio Cabling / 音频布线组 Keyman / 负责人 Prasert 🔑 Team Members / 小组成员 Lucy 露西 Zabrina 柏莉娜 Siiri Crew Overseer / 小组监督 Gyeong-hwan Lee 李俊辉 🇬🇧 English Instructions Purpose Instal...
Audio Booth (AHEC-1) / 音频控制台组(AHEC-1)
🎤 Audio Booth Team / 音频控制台组 Team Information / 小组信息 Item / 项目 Information / 信息 Team / 小组 Audio Booth / 音频控制台组 Keyman / 负责人 Willy 🔑 Crew Overseer / 小组监督 Gyeong-hwan Lee 李俊辉 🇬🇧 English Instructions Purpose Install, connect, and commission the Audio Headend (AHEC...
Schematics Overview / 图纸总览
📐 Master Schematics / 图纸总览 Purpose / 目的 This page contains all official A/V schematics / 图纸 for the 2026 Bangkok Regional Convention — Imperial World Samrong. 本页面包含 2026 年曼谷区域大会 — Imperial World Samrong 的所有正式影音图纸。 Full Drawing Set / 完整图纸 📎 Complete PDF / 完整 PD...
Stage Layout Setup / 讲台布局安装
🎭 Stage Team / 讲台组 Team Information / 小组信息 Item / 项目 Information / 信息 Team / 小组 Stage Setup / 讲台安装 Keyman / 负责人 Tomohiro 木田智宏 🔑 Team Members / 小组成员 Chloe 金素螺 Sayako Kazue Shoji Daphne Crew Overseer / 小组监督 Liu Shan 刘善 🇬🇧 English Instructions Purpose Prepare the...
Setup Teams / 安装小组
👥 Installation Crews & Teams / 安装部门与小组 Purpose / 目的 This page provides an overview of the installation crews, teams, and keymen for the 2026 Bangkok Regional Convention. 本页面概述 2026 年曼谷区域大会影音部安装部门、小组及负责人。 🔑 Keyman / 负责人: The 🔑 icon identifies the designated Tea...
Video Cabling & TVs Setup / 视频布线及电视安装
🎬 Video Cabling & TVs Team / 视频布线及电视组 Team Information / 小组信息 Item / 项目 Information / 信息 Team / 小组 Video Cabling & TVs / 视频布线及电视组 Keyman / 负责人 Keiichi 加藤圭一 🔑 Team Members / 小组成员 Sung 成玲 金娜 Kaharu Kida Crew Overseer / 小组监督 Tatsuo Shoji 庄子起央 🇬🇧 English Instructi...
Loudspeakers Setup / 扬声器安装
🎤 Loudspeakers Team / 扬声器组 Team / 小组 Members / 成员 Loudspeakers / 扬声器 • Alex Jang 🔑 🇬🇧 English Instructions Purpose Measure the layout and safely install, connect, raise, aim, and test loudspeaker Groups 1–3 for the main audience sound system. Assignment Scope:...
Power Distribution and Intercom Setup / 电源分配与对讲系统安装
⚡ Power Distribution Team / 电源分配组 Team / 小组 Members / 成员 Power Distribution / 电源分配 • Jaturaphat (Dern) 🔑 🇬🇧 English Instructions Purpose Route power to A/V equipment, install the intercom system, and set up the WM-1 wireless microphone system before final test...
Video Booth Setup / 视频控制台安装
🎬 Video Booth Team / 视频控制台 Team / 小组 Members / 成员 Video Booth / 视频控制台组 • Jung 郑英雄 🔑 🇬🇧 English Instructions Purpose This section provides the specific setup and dismantling instructions for the Video Booth Team, including setting up the VHEC-1, media players, ...
CABR-2026-10 Assembly A/V
English A/V schedule, setup and pack-up instructions for the 2026/10/11 assembly at Imperial World Samrong, Samut Prakan. Thank you for helping! Crew files: Shared with crew folder.
Schedules
Friday logistics, Saturday installation and pioneer meeting, and Sunday assignments and cues.
Event overview and key times
Welcome, and thank you for helping with the A/V work for our assembly. Venue: Imperial World Samrong, Samut Prakan — 6th floor Assembly: Sunday, 11 October 2026 Setup: Saturday, 10 October 2026 Contacts: JP Bourgeois, A/V overseer · Alex Li, audio overseer · J...
Saturday pioneer meeting — 15:00
Special meeting with pioneers: Saturday, 10 October 2026 at 15:00, at the same venue. Theme: “Enrich Your Ministry by Setting Goals!” — Proverbs 4:25 Stage Layout (S-343) PDF — open / download copy DOCX — open / download copy PDF updated from the DOCX on 7 Oct...
Sunday program assignments and A/V cues
Stage Layout (S-343) PDF — open / download copy DOCX — open / download copy PDF updated from the DOCX on 7 October 2026. The live roster is the assignment source. Audio Position Morning Afternoon Mixer operator Ronan Gav Budd Kassander Jensen Mixer assistant A...
Setup instructions
Team tasks with drawing sheets, commissioning, safety and pack-up.
Setup teams and handoffs
Thank you for helping with the assembly setup on Saturday, 10 October. This is the best page to start from. Find your team below, then open that team's page for the detailed instructions. Before setup: Everyone helping with installation or dismantling — includ...