Audio Cabling Setup
Audio Cabling Team / 音频布线组
Team Information / 小组信息
| Keyman / 负责人 | To be assigned / 待安排 |
| Assistant / 助手 | To be assigned / 待安排 |
Team Members / 小组成员
| # | Name / 姓名 |
|---|---|
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 |
Keyman Responsibilities / 负责人职责
Coordinate team activities and assignments.
Ensure work follows the system schematic.
Verify setup completion before reporting the task finished.
协调小组工作和任务分配。
确保所有工作按照系统图执行。
在报告任务完成前确认安装质量。
Purpose / 目的
Install, protect, and label all audio cabling according to the approved system schematicSchematics before system commissioning.
根据批准的系统图安装、根据图纸安装、保护并标识所有音频线缆,为系统调试做好准备。
Required References / 参考资料
Audio System SchematicSchematics /音频系统图图纸
Safety Notes / 安全提醒
- Keep walkways clear. / 保持通道畅通。
- Protect all cables crossing walkways. / 所有经过通道的线缆都必须加以保护。
- Confirm routing before securing cables. / 固定线缆前确认走线路径。
Setup Steps / 安装步骤
1. Install Snake Cable / 铺设主音频蛇线
📷 Add routing overview photo herehere.
- Pull the snake cable according to the
system schematic.Schematics. - Start at the front stage-left position.
- Verify routing before securing the cable.
按照系统图铺设主音频蛇线。按照图纸铺设主音频蛇线。
- 从舞台前方左侧开始。
- 固定线缆前确认走线路径正确。
2. Install Speaker Cables / 铺设扬声器线缆
📷 Add speaker cable routing photo herehere.
- Pull all speaker cables according to the
system schematic.Schematics. - Connect each loudspeaker group.
- Verify cable labels before connection.
按照系统图铺设所有扬声器线缆。按照图纸铺设所有扬声器线缆。
- 连接各扬声器组。
- 连接前确认线缆标签正确。
3. Protect Cabling / 保护线缆
📷 Add cable protection photo herehere.
- Use tape, carpet covers, or floor cable channels where required.
- Ensure all walkways remain safe.
根据需要使用胶带、地毯覆盖物或线槽保护线缆。
确保所有通道安全可通行。
4. Install Carpet Covers / 安装地毯覆盖物
📷 Add carpet cover photo herehere.
- Tape one side first.
- Complete cable installation.
- Tape the second side after final verification.
先固定一侧。
完成线缆安装后,再固定另一侧。
Completion Checklist / 完成检查表
- Snake cable installed / 主蛇线已铺设
- Speaker cables installed / 扬声器线缆已铺设
- Routing matches
schematicSchematics /走线符合系统图走线符合图纸 - Cables protected / 线缆已保护
- Walkways safe / 通道安全
-
Team leaderKeyman inspection completed /组长已检查确认负责人已检查确认
Dismantling / 拆卸
Procedure / 步骤
- Gather all audio cabling. / 收集所有音频线缆。
- Remove carpet covers and floor channels. / 移除地毯覆盖物和线槽。
- Bring all equipment to the designated collection area. / 将所有设备带到指定集合区域。
- Confirm no cables remain in the seating area. / 确认座位区域没有遗留线缆。
Related Pages / 相关页面
- Loudspeaker Team / 扬声器组
- Stage Team / 讲台组
- Audio Booth Team / 音频控制台组