Friday transport and Saturday installation
Friday, 9 October
Friday crew: To be confirmed. At present, JP, Zabrina, Mike Vigil and Lilia Vigil are the only crew members who list Friday availability.
Trucking contact: Korawat Sungmongkol, Trucking and Equipment overseer.
Time | What happens |
|---|---|
16:30 | Tentative safety briefing at the truck unloading area, led by Trucking. |
About 16:45 | Help move the Kingdom Hall warehouse delivery to the 6th-floor hall. |
About 17:45 | The LBD A/V truck arrives from Branch Storage. Count the cases against the October BOM. |
Case handling:
Close all latches before moving a case. Roll wheeled cases on a clear route, use the lift, and use enough helpers for loads over 20 kg or bulky items. Wear work shoes and gloves. Move the PLS-1 and TP-1 cases with Trucking’s help. Store the cases together, closed and clear of exits in the 6th-floor hall overnight.
If a case is missing or damaged, tell JP. Photograph damage and report it to LBD: 02-821-6620 · [email protected].
Saturday, 10 October
Time | What happens |
|---|---|
08:00 | Safety talk and prayer, led by JP. Each keyman then reviews the team's DC-83 and the work area. |
After the talk | Power, Audio Cabling, Loudspeakers, Stage and A/V Booth begin together. |
Morning | Keymen guide the work. Keep exits clear and protect every floor crossing. |
By 12:00 | Setup is handed to Alex for commissioning, microphone adjustment, sound checks, media tests and projector tests. |
By 14:00 | Have the AHEC commissioned so attendees can enter. |
The priority is to make the booth power, 30 m AMC-3 audio multicore (snake) cable, six passive loudspeakers with their speakON cables, and XLR stage-microphone cables ready early enough for testing.
Team pages: Audio Cabling · A/V Booth · Loudspeakers · Stage · Power